Month: January 1970

Block Island Times

Grid and Deepwater Wind/Ørsted ordered to reinstall their cables

The Rhode Island Coastal Resources Management Council has issued “an enforcement order” on both Deepwater Wind/Ørsted and National Grid to reinstall their cables at Block Island’s Town Beach. Both cables, which comprise the Block Island Wind Farm’s electrical transmission system, and were supposed to remain buried beneath the seabed, became exposed due to shifting sands …

Grid and Deepwater Wind/Ørsted ordered to reinstall their cables Read More »